Aker Solutions was awarded a contract from Subsea 7 on June 10 to deliver umbilicals for Murphy Exploration and Production Co. — USA’s King’s Quay development in the U.S. Gulf of Mexico.
The work scope includes 22 km (14 miles) of dynamic steel-tube umbilicals and distribution equipment to connect the King’s Quay floating production system (FPS) to the Samurai, Khaleesi and Mormont deepwater developments.
![Aker](/sites/default/files/inline-images/Aker%20Solutions.jpg)
The King’s Quay semisubmersible FPS will be located around 280 km (175 miles) south of New Orleans in the Green Canyon area of the U.S. Gulf of Mexico.
“We look forward to working with Subsea 7 on one of the largest subsea development projects in the Gulf of Mexico,” Jonah Margulis, U.S. vice president and country manager for Aker Solutions, said. “Aker Solutions and Subsea 7 have built a collaborative and high-performing relationship over time, with a strong track-record of excellent project execution.”
The engineering, design and manufacturing of the umbilicals and distribution equipment will take place at Aker Solutions’ facility in Mobile, Alabama in the U.S.. The work starts immediately and the delivery is planned for the fourth quarter of 2021.
The contract will be booked as order intake in the second quarter of 2020.
Recommended Reading
Walking the Talk: Exxon Mobil Makes CCUS Strides
2024-06-27 - Exxon Mobil is developing a low-carbon intensity hydrogen plant using natural gas as feedstock and carbon capture in Baytown, Texas.
Seeing is Believing: Fiber Optics for CO2 Storage Monitoring
2024-07-02 - Fiber optic systems can offer CO2 plume insights in CCS applications, according to services company Weatherford.
CORMETECH, Ozona to Develop Flue Gas CCUS System
2024-06-19 - CORMETECH and Ozona CCS’ system includes integrated nitrogen oxide reduction and aims to capture, transport and sequester CO2 from flue gas, which is generated from natural-gas powered engines.
Shell Takes FID on Carbon Capture, Storage Projects in Canada
2024-06-26 - Shell’s CCS projects are expected to start operations near the end of 2028, Shell said in a news release.
Equinor Expands CCS Network with North Sea Licenses
2024-06-20 - Equinor received two new CO2 storage licenses and a permit to explore a carbon capture facility in Denmark.