Brazil auctioned off the exploration rights to 33 minor onshore and offshore oil and gas blocks on Sept. 10, in what authorities framed as a bid to boost the industry outside of the nation’s core, offshore presalt play.
At an event in downtown Rio de Janeiro, firms that included the Brazilian unit of Exxon Mobil Corp. and domestic startups paid a total of 15.32 million reais (US$3.74 million) for the rights to explore the areas in question.
The companies also pledged a minimum level of investment in the areas, all of which either failed to receive bids in previous auctions or were returned to the state after unsuccessful exploration.
The auction was the first round of what the government is calling a “permanent offer,” in which firms have the right to bid on a rotating basis for certain blocks that have been previously passed up or returned to the state.
A consortium composed of Exxon Mobil (50%), Murphy Oil Corp. (20%) and Enauta Participacoes SA (30%) was the main bidder, agreeing to pay roughly 7.85 million reais for three deepwater blocks off the coast of Sergipe and Alagoas states.
Eneva SA, a Brazilian energy firm, scooped up several onshore fields in the northeastern state of Maranhao for about 3.5 million reais.
In a subsequent process, the government also sold the rights to 12 blocks with “marginal” proven reserves of oil or gas, mainly to small independent firms. The total signing bonuses for those blocks came to 6.98 million reais.
Recommended Reading
Encino’s Tim Parker: Plenty of Utica Oil—and Takeaway Too
2024-11-15 - Encino Energy's Tim Parker tells Hart Energy's Nissa Darbonne about the economics of drilling in the company's Utica oil development at the DUG Appalachia Conference and Expo.
TotalEnergies Awards SBM Offshore FPSO GranMorgu Development Contract
2024-11-15 - SBM will construct and install a floating production, storage and offloading vessel for TotalEnergies alongside its partner Technip Energies, the company said.
GeoPark Announces Production Start at Argentina’s Confluencia Norte
2024-11-12 - GeoPark expects production at the Confluencia Norte Block in Rio Negro, Argentina to reach its peak within 90 days of startup.
Interoil Extends Asset Life with Successful Well Intervention in Colombia
2024-11-11 - Interoil’s intervention brought production at Vikingo well back up to 400 bbl/d of oil.
E&P Highlights: Nov. 11, 2024
2024-11-11 - Here’s a roundup of the latest E&P headlines, including Equinor’s acquisition of a stake in a major project and a collaboration between oilfield service companies.