![Fugro](/sites/default/files/styles/hart_news_article_image_640/public/image/2020/08/fugro-s-roc-aberdeen29b5b6f2f3db67859f9dff250019aa6etmb-mh600.jpg?itok=8PdDOW8c)
Fugro’s state-of-the art remote operations centre (ROC) in Aberdeen. (Source: Fugro)
Fugro has delivered the first fully remote inspection of an oil and gas platform in U.K. waters, 250 km east of Scotland, using a ROV and Fugro’s state-of-the art remote operations center (ROC) in Aberdeen, the company said on Aug. 4.
In a first for the U.K. sector, the platform’s entire jacket structure was inspected remotely, demonstrating Fugro’s proficiency in remote operations capabilities.
Fugro originally intended to trial the remote inspection provision during the campaign. However, when only one offshore inspection engineer was able to mobilize to the platform due to COVID-19, inspection engineers based at Fugro’s ROC in Aberdeen stepped in and delivered the whole project remotely to stay on schedule. The ROV was mobilized with dedicated remote systems for visual inspection, cathodic protection (CP) and flooded member detection (FMD), and all systems were base-checked to confirm communications links with the ROC. Fugro also transacted a COABIS database across the onshore and offshore locations; this allowed the client and ROC personnel to access data acquired by the ROV in near real time.
“This innovative approach allowed for efficient scope delivery and demonstrates to all our clients the opportunities for maximizing operational windows whilst reducing offshore HSSE exposure, which is always important but even more so during the current pandemic,” Karl Daly, Fugro’s director for IRM services in Europe, said.
Recommended Reading
Safety First, Efficiency Follows: Unconventional Completions Go Automated
2024-07-18 - The unconventional completions sector has seen a tremendous growth in daily stage capacity and operation efficiencies, primarily driven by process and product innovations in the plug and perf space.
E-wireline: NexTier Taps Oilfield Grid, Automation for Completions
2024-07-23 - NexTier Completion Solutions is using advanced electric-drive equipment, automation-enabled pump down technology and digital connectivity to optimize wellsite operations during shale completions.
Honeywell Bags Air Products’ LNG Process, Equipment Business for $1.8B
2024-07-10 - Honeywell is growing its energy transition services offerings with the acquisition of Air Products’ LNG process technology and equipment business for $1.81 billion.
TGS Awarded Ocean Bottom Node Data Acquisition Contract in North America
2024-07-17 - The six-month contract was granted by a returning client for TGS to back up the client’s seismic data capabilities for informed decision making.
PGS Gets Greenlight to Begin Surveying for Petrobras 4D Contract
2024-05-30 - After a long permitting process, PGS has secured the last permit needed to begin its large 4D survey contract with Petrobras at the Barracuda-Caratinga field offshore Brazil.