Helix Energy Solutions Group Inc. has entered into a new agreement for response resources with HWCG LLC, the company said on March 8.
Under the agreement, HWCG’s members are given the opportunity to identify the Helix Fast Response System as a response resource in permit applications to U.S. federal and state agencies, and to deploy the Helix Fast Response System to respond to a well control incident in the U.S. Gulf of Mexico. Developed in 2011 as a culmination of Helix’s experience as a responder in the Macondo well control and containment efforts, the Helix Fast Response System consists of the Helix Producer I floating production unit, Q4000 or Q5000 vessels, subsea intervention systems, crude transfer systems and other well control equipment.
Under the terms of the agreement, HWCG will pay Helix an annual retention fee. HWCG’s members will receive a credit against the annual retention fee for every day that a member utilizes the Q4000 or Q5000. The agreement replaces the parties’ prior agreement and is effective April 1, 2021 for an initial two-year term.
“We are pleased to continue our long-standing relationship with HWCG, and are proud to stand on call as a first responder in the Gulf of Mexico,” Owen Kratz, CEO of Helix, said. “Helix’s industry expertise in offshore well intervention and well control is second to none, and we feel this agreement demonstrates the parties’ commitment to the continued safe planning, operation and execution of offshore oil and gas production. We embrace our role as a provider of sustainable solutions, are proud to offer the Helix Fast Response System to help mitigate and remediate the environmental risks associated with offshore drilling and production operations.”
Recommended Reading
Element Six, Master Drilling Announce Tunnel Development Partnership
2025-02-19 - Element Six and Master Drilling will deliver a diamond-enabled solution designed to increase tunneling development speed, reducing costs and minimize the environmental impact of tunnel construction.
Pair of Large Quakes Rattle Texas Oil Patch, Putting Spotlight on Water Disposal
2025-02-19 - Two large earthquakes that hit the Permian Basin, the top U.S. oilfield, this week have rattled the Texas oil industry and put a fresh spotlight on the water disposal practices that can lead to increases in seismic activity, industry consultants said on Feb. 18.
E&P Seller Beware: The Buyer May be Armed with AI Intel
2025-02-18 - Go AI or leave money on the table, warned panelists in a NAPE program.
PrePad Tosses Spreadsheets for Drilling Completions Simulation Models
2025-02-18 - Startup PrePad’s discrete-event simulation model condenses the dozens of variables in a drilling operation to optimize the economics of drilling and completions. Big names such as Devon Energy, Chevron Technology Ventures and Coterra Energy have taken notice.
Aris CEO Brock Foresees Consolidation as Need for Water Management Grows
2025-02-14 - As E&Ps get more efficient and operators drill longer laterals, the sheer amount of produced water continues to grow. Aris Water Solutions CEO Amanda Brock says consolidation is likely to handle the needed infrastructure expansions.