![Schlumberger](/sites/default/files/styles/hart_news_article_image_640/public/image/2019/09/drill-bit.jpg?itok=h-etmlS6)
Aegis armor cladding technology leverages material science to improve bit body design flexibility and erosion resistance. (Source: Schlumberger Ltd.)
Material science innovation yields new proprietary bit body material for improved drilling performance
Smith Bits, a Schlumberger company, on Sept. 30 introduced Aegis* armor cladding that significantly improves bit body design flexibility and erosion resistance, increasing rate of penetration (ROP) and bit durability for longer runs.
Composed of a proprietary tungsten carbide material, Aegis cladding increases bit erosion resistance by 400% and strength by 40% when compared to conventional matrix polycrystalline diamond compact (PDC) bits.
“Our new armor cladding technology combines innovative materials science with an electron-beam additive manufacturing process,” Kristi Vilay, president, Bits & Drilling Tools, Schlumberger, said. “This new manufacturing approach allows us to integrate a new proprietary material into our customized, fit-for-basin bits, providing a differentiated technology to improve our customers’ overall drilling performance.”
In addition to improving erosion resistance, Aegis cladding enables bit designs with taller blades and optimal nozzle placement. This results in more efficient cuttings evacuation that improves ROP.
Aegis cladding has undergone extensive field testing across five shale basins in North America. The technology has also been field tested in Europe, the Middle East and South America for both onshore and offshore applications.
In Oklahoma’s Anadarko Basin, two steel-bodied bits with Aegis cladding were deployed for an international oil and gas company in eight wells for a total of eight bit runs. The use of Aegis cladding enhanced the fit-for-basin bit design with taller blades and optimal nozzle placement. This increased ROP by 36% compared with direct offset runs of matrix PDC bits and saved the customer an estimated 179 hours of drilling time across the eight runs.
Recommended Reading
Expand Appoints Dan Turco to EVP of Marketing, Commercial
2025-02-13 - Expand Energy Corp. has appointed industry veteran Dan Turco as executive vice president of marketing and commercial.
Imperial Appoints New President, CEO Following Brad Corson’s Retirement
2025-02-13 - Imperial’s board of directors has appointed Exxon Mobil’s John Whelan as president effective April 1 and to assume the roles of chairman and CEO on May 8.
Italy's Intesa Sanpaolo Adds to List of Banks Shunning Papua LNG Project
2025-02-13 - Italy's largest banking group, Intesa Sanpaolo, is the latest in a list of banks unwilling to finance a $10 billion LNG project in Papua New Guinea being developed by France's TotalEnergies, Australia's Santos and the U.S.' Exxon Mobil.
Trump Nominates E&P Advocate Sgamma to Head Bureau of Land Management
2025-02-12 - If confirmed by the Senate, Kathleen Sgamma, president of the Western Energy Alliance, would oversee management of approximately 245 million acres of surface lands.
Chevron to Lay Off 15% to 20% of Global Workforce
2025-02-12 - At the end of 2023, Chevron employed 40,212 people across its operations. A layoff of 20% of total employees would be about 8,000 people.