Sound Energy said it has confirmed a significant gas discovery and a potential single gas column at its Tendrara license in Morocco, the company said in a news release.
The TE-6 well encountered the top of the structure and about 28 m of net gas pay in the TAGI reservoir after drilling to a measured vertical depth of 2,665 m. A stabilized gas flow rate of 17 MMscf/d was reached on Aug. 7, the company said, noting the results “represents a highly commercial rate.”
“I believe Tendrara, Meridja and the Eastern Morocco TAGI play have the potential to be a material hydrocarbon province on a regional scale and therefore to transform both Sound Energy and the Moroccan gas industry,” Sound Energy CEO James Parsons said in the release.
In addition, Sound Energy reported a reservoir bottom-hole pressure of 420 bars and said the recorded static pressure correlates, in terms of gas gradient, with wells previously drilled in the area.
“The combination of these factors together with the fact that none of the historically drilled wells on the license have identified a gas/water contact, suggests the possibility of a significant gas column within a continuous extended structure,” Sound Energy said in the release.
Working with Schlumberger, Sound Energy is gearing up for the second well at Tendrara. TE-7 is located about 1.3 km from TE-6. Plans are to utilize sub-horizontal drilling techniques aimed at increasing the well flow rate. Following this, the company said an extended well test will be conducted. Drilling is set to begin sometime this month.
Until the results of TE-7 are confirmed, TE-6 will be suspended, according to the release. Once the results are confirmed, the company said it plans to apply for a production concession and start detailed engineering for construction of the necessary infrastructure.
Sound Energy has a net effective interest of 27.5% in the Tendrara license, the release said.
Recommended Reading
Aris CEO Brock Foresees Consolidation as Need for Water Management Grows
2025-02-14 - As E&Ps get more efficient and operators drill longer laterals, the sheer amount of produced water continues to grow. Aris Water Solutions CEO Amanda Brock says consolidation is likely to handle the needed infrastructure expansions.
Halliburton, Sekal Partner on World’s First Automated On-Bottom Drilling System
2025-02-26 - Halliburton Co. and Sekal AS delivered the well for Equinor on the Norwegian Continental Shelf.
E&P Highlights: March 3, 2025
2025-03-03 - Here’s a roundup of the latest E&P headlines, from planned Kolibri wells in Oklahoma to a discovery in the Barents Sea.
How DeepSeek Made Jevons Trend Again
2025-03-25 - As tech and energy investors began scrambling to revise stock valuations after the news broke, Microsoft Corp.’s CEO called it before markets open: “Jevons paradox strikes again!”
Pair of Large Quakes Rattle Texas Oil Patch, Putting Spotlight on Water Disposal
2025-02-19 - Two large earthquakes that hit the Permian Basin, the top U.S. oilfield, this week have rattled the Texas oil industry and put a fresh spotlight on the water disposal practices that can lead to increases in seismic activity, industry consultants said on Feb. 18.