TechnipFMC said Oct. 9 that JFT—a consortium between JGC Corp., Fluor Corp. and TechnipFMC—has been awarded an engineering, procurement and construction (EPC) contract by Mozambique Rovuma Venture S.p.A. (MRV) for the Rovuma LNG onshore production complex project located in Cabo Delgado, Mozambique.
MRV, a joint-venture composed of Eni, Exxon Mobil and CNPC, holds a 70% interest in the exploration and production concession of Area 4, with Galp, Kogas and Empresa Nacional de Hidrocarbonetos each holding a 10% interest.
The Rovuma LNG Project will produce, liquefy and market natural gas from three reservoirs of the Mamba complex located in the Area 4 block in the offshore Rovuma Basin. It includes the construction of two NGL trains, with a total LNG nameplate capacity of 15.2 mtpa, as well as associated onshore facilities.
“We are extremely honored to have been awarded by MRV this new prestigious LNG project along with our long-time partners, JGC and Fluor,” Nello Uccelletti, president Onshore/Offshore at TechnipFMC, said. “This award confirms the market recognition of TechnipFMC’s expertise and track record in gas monetization and, in particular, in the LNG industry. It also reinforces the company’s positioning in the energy transition journey. TechnipFMC is a strong player in Mozambique, a strategic country for the company, and already present through key LNG and Subsea on-going projects.”
Recommended Reading
Exxon Plans Longest 20,000-Ft Wells on Pioneer’s Midland Asset
2024-11-04 - Exxon Mobil has already drilled some of the longest wells in the New Mexico Delaware Basin. Now, the Texas-based supermajor looks to go longer on Pioneer’s Midland Basin asset.
SM, Crescent Testing New Benches in Oily, Stacked Uinta Basin
2024-11-05 - The operators are landing laterals in zones in the estimated 17 stacked benches in addition to the traditional Uteland Butte.
Comstock: Monster Western Haynesville Wildcats Cost $30MM-plus
2024-10-31 - Comstock Resources is flowing back a 13th well currently in the play where the oldest has made 2.2 Bcf per 1,000 lateral feet to date in its first 29 months online.
E&P Highlights: Dec. 16, 2024
2024-12-16 - Here’s a roundup of the latest E&P headlines, including a pair of contracts awarded offshore Brazil, development progress in the Tishomingo Field in Oklahoma and a partnership that will deploy advanced electric simul-frac fleets across the Permian Basin.
Matador’s U-lateral Delaware Tests Outproduce 2-mile Straight Holes
2024-10-30 - Matador Resources' results from eight Loving County, Texas, tests include two 2-mile U-turn laterals, five 2-mile straight laterals and one 1-mile straight lateral, according to state data.