Chevron Announces Results from Five Marcellus Producers in Fayette County, Pa.
Drilling Activity Details
Fayette
PA
United States
Drilling Activity Summary
Description
Five Fayette County, Pa., Marcellus Shale wells were completed by Houston-based Chevron Corp. The producers were drilled from a Luzerne Field pad in Section 2, Carmichaels 7.5 Quad, Luzerne Township. The #1H Yoder was drilled to 18,266 (7,920 ft true vertical) and flowed 3.803 MMcf of gas with a shut-in casing pressure of 4,619 psi. Production is from a perforated zone at 8,592-18,043 ft. The #2H Yoder was drilled to 17,268 ft, 8,000 ft true vertical and flowed 3.402 MMcf of gas per day from perforations at 8,406-17,043 ft with a shut-in casing pressure of 4,585 psi. The #5H Yoder was drilled to 16,899 ft, 8,100 ft true vertical, and produced 3.571 MMcf of gas per day from perforations at 8,641-16,701 ft. The #6H Yoder was drilled to 18,201 ft, 8,000 ft true vertical, and produced 5.906 MMcf of gas per day from perforations at 8,341-15,665 ft with a shut-in casing pressure of 4,425 psi. The #10 H Yoder was drilled to 16,834 ft, 8,000 ft true vertical, and was tested flowing 2.657 MMcf of gas per day from perforations at 8,739-16,600 ft with a shut-in casing pressure of 4.171 psi.
Five Fayette County, Pa., Marcellus Shale wells were completed by Houston-based Chevron Corp. The producers were drilled from a Luzerne Field pad in Section 2, Carmichaels 7.5 Quad, Luzerne Township. The #1H Yoder was drilled to 18,266 (7,920 ft true vertical) and flowed 3.803 MMcf of gas with a shut-in casing pressure of 4,619 psi. Production is from a perforated zone at 8,592-18,043 ft. The #2H Yoder was drilled to 17,268 ft, 8,000 ft true vertical and flowed 3.402 MMcf of gas per day from perforations at 8,406-17,043 ft with a shut-in casing pressure of 4,585 psi. The #5H Yoder was drilled to 16,899 ft, 8,100 ft true vertical, and produced 3.571 MMcf of gas per day from perforations at 8,641-16,701 ft. The #6H Yoder was drilled to 18,201 ft, 8,000 ft true vertical, and produced 5.906 MMcf of gas per day from perforations at 8,341-15,665 ft with a shut-in casing pressure of 4,425 psi. The #10 H Yoder was drilled to 16,834 ft, 8,000 ft true vertical, and was tested flowing 2.657 MMcf of gas per day from perforations at 8,739-16,600 ft with a shut-in casing pressure of 4.171 psi.