Three Midland County, Texas, Lower Spraberry Wells Announced by Chevron
Drilling Activity Details
Midland
TX
United States
Drilling Activity Summary
Description
In Midland County (RRC Dist. 8), Texas, Chevron Corp. reported three Lower Spraberry-Spraberry Field wells. The ventures were drilled from a single pad in T&P RR Co Survey, A-201. The #261LS CMC Tiger Unit was drilled to 19,880 ft, 9,073 ft true vertical and was kicked off at 8,407 ft. It flowed 1,785 bbl of 44.7° API oil and 1.139 MMcf of gas daily from perforations at 9,475-19,751 ft. Tested on an unreported choke size, the flowing tubing pressure was 276 psi. The #263LS CMC Tiger Unit has a total depth of 19,903 ft and a true vertical depth of 9,087 ft with a kick-off point at 8,520 ft. It produced 1,505 bbl of 44.7° API oil with 660,000 cu ft of gas per day from perforations at 9,478-19,778 ft. Tested on an unreported choke size, the flowing tubing pressure was 207 psi. The #263LS CMC Tiger Unit pumped 1,189 bbl of 44.7° API oil and 970,000 cu ft of gas per day. Production is from a perforated zone at 9,646-19,947 ft. The well was drilled to 20,070 ft, 9,073 ft true vertical with and the flowing tubing pressure was 290 psi. Chevron’s headquarters are in Houston.
In Midland County (RRC Dist. 8), Texas, Chevron Corp. reported three Lower Spraberry-Spraberry Field wells. The ventures were drilled from a single pad in T&P RR Co Survey, A-201. The #261LS CMC Tiger Unit was drilled to 19,880 ft, 9,073 ft true vertical and was kicked off at 8,407 ft. It flowed 1,785 bbl of 44.7° API oil and 1.139 MMcf of gas daily from perforations at 9,475-19,751 ft. Tested on an unreported choke size, the flowing tubing pressure was 276 psi. The #263LS CMC Tiger Unit has a total depth of 19,903 ft and a true vertical depth of 9,087 ft with a kick-off point at 8,520 ft. It produced 1,505 bbl of 44.7° API oil with 660,000 cu ft of gas per day from perforations at 9,478-19,778 ft. Tested on an unreported choke size, the flowing tubing pressure was 207 psi. The #263LS CMC Tiger Unit pumped 1,189 bbl of 44.7° API oil and 970,000 cu ft of gas per day. Production is from a perforated zone at 9,646-19,947 ft. The well was drilled to 20,070 ft, 9,073 ft true vertical with and the flowing tubing pressure was 290 psi. Chevron’s headquarters are in Houston.