Two High-volume Three Forks-Nesson Anticline Wells Completed by Hess Corp.
Drilling Activity Details
McKenzie
ND
United States
Drilling Activity Summary
Description
Two McKenzie County, N.D., Three Forks wells on the Nesson Anticline were completed by Hess Corp. in Blue Buttes Field in Section 7-150n-95w. The #150-95-0718H-6 BB-Charlie Loomer was drilled to 21,410 ft, and the true vertical depth is 10,804 ft. It produced 3.771 Mbbl of oil, 9.812 MMcf of gas and 1.488 Mbbl of water per day from perforations at 11,228-21,111 ft after 30-stage fracturing. Gauged on a 44/64-in. choke, the flowing tubing pressure was 1,790 psi. The #150-95-0718H-9 BB-Charlie Loomer was drilled to 18,781 ft, 10,720 true vertical. It flowed 4.251 Mbbl of oil, 10.298 MMcf of gas and 1.096 Mbbl of water per day from perforations at 11,228-21,111 ft after 22-stage fracturing. It was tested on a 44/64-in. choke, and the flowing tubing pressure was 1,501 psi. Hess is based in New York City.
Two McKenzie County, N.D., Three Forks wells on the Nesson Anticline were completed by Hess Corp. in Blue Buttes Field in Section 7-150n-95w. The #150-95-0718H-6 BB-Charlie Loomer was drilled to 21,410 ft, and the true vertical depth is 10,804 ft. It produced 3.771 Mbbl of oil, 9.812 MMcf of gas and 1.488 Mbbl of water per day from perforations at 11,228-21,111 ft after 30-stage fracturing. Gauged on a 44/64-in. choke, the flowing tubing pressure was 1,790 psi. The #150-95-0718H-9 BB-Charlie Loomer was drilled to 18,781 ft, 10,720 true vertical. It flowed 4.251 Mbbl of oil, 10.298 MMcf of gas and 1.096 Mbbl of water per day from perforations at 11,228-21,111 ft after 22-stage fracturing. It was tested on a 44/64-in. choke, and the flowing tubing pressure was 1,501 psi. Hess is based in New York City.